Campbelltown Golf Club

Campbelltown Golf Club have developed a new golf simulator facility and completed a stunning club makeover, with Cullinan Ivanov providing architecture, interior design and project coordination – managing the project from inception to completion on behalf of the club.

The project brief sought to develop design options for additional revenue opportunities including – 4 new golf simulator bays, a new alfresco terrace overlooking the course, re‑modelled foyer and entry sequence, new gaming lounge, and a major kitchen refurbishment.

The transformation has made a dramatic difference to the look and feel of the club and seen a significant rise in patronage and revenues. Feedback has been extremely positive from members, guests and staff.

Cullinan Ivanov Director Richard Cullinan said, “I am very proud of what our team has delivered at Campbelltown Golf Club. Whilst it is a relatively small project for C I, it has been incredibly rewarding to achieve so much on a tight project budget. And to have a project so well received is a tribute to our team and our incredibly important project partners.”

Project Team
Architecture, Interior Design, and Project Coordination – Cullinan Ivanov 
Planner – Premise
Builder – Meridian Construction Services
Structure – Bligh Tanner 
Mechanical – Nabil Lakiss & Associates 
Electrical – Lo Fi 
Lighting – Malaya Blonde 
Hydraulic + Fire – Harris Page 
Food and Beverage – Cini Little 
BCA / Access – Jensen Hughes 
Planner – Premise
Furniture – Identity, Cult, Cotswold, KeZu
Photography – Murray Fredericks Photography

Vital Project Stats
Area = 985m² Internal / 365m² External
Project Delivery Method = Construction Management
Construction Cost = $3.06m
Rate / m2 = $2,270 (Construction FY25/26)
Total Development Cost (Incl. FFE, Authority and Consultant Fees) = $3.81m
Total Consultant / PM / Authority Fees = 12.4%
Variations % = 2.5%
Construction Program = 7 months